Research on Optimization of Earned Value Management Method in Engineering Budget Management
                                            
                                                The Open Civil Engineering Journal
                                             • 
                                            29 May 2015 • 
                                            
                                                RESEARCH ARTICLE
                                             • 
                                            DOI: 10.2174/1874149501509010369
                                        
                                        
                                        						
			Abstract
Earned Value Management Method (EVM), widely used in the world, is a project management method of costschedule integrated control. But the traditional EVM sometimes cannot provide an accurate result. In this paper, a practical method is given to analyze the project performance, in which the Network Diagram Method and the Critical Path Method have been introduced into EVM system that can better reflect the practical situation of a project. This improved method can be referred to assub-level earned value analysis method. This method can correct variance in the duration and cost forecast of the traditional EVM, and can also provide more information about the cause analysis.
Keywords: Sub-level Earned Value, performance evaluation, Earned Value Management, Critical Path Method (CPM).
                                        1800
                        1801
                        1802
                        1803
                        1804
                    
 
                                                                         
                        